VALE – Cauê facilities adequacy project to ROM 2012 – Itabira – MG

Beneficiation Plant – 26 mtpy (7 mtpy sinter feed and 19 Mtpy pellet feed) – Conceptual / Basic / Detailed Engineering developed by ECM. Project implemented using Project Automation technology (3D).


VALE – Conceição facilities adequacy project to ROM 2014 – Itabira – MG

Beneficiation Plant – 19.2 Mtpy – Conceptual / Basic / Detailed Engineering developed by ECM. Project implemented using Project Automation technology (3D).


ANGLO AMERICAN – Minas-Rio Project – Conceição do Mato Dentro – MG

Beneficiation Plant / Pipeline – 26.5 Mtpy – Conceptual, basic and detailed engineering and Procurement.Large scale project for the treatment of lower-grade ores, adopting new technologies and large equipment. The project includes Beneficiation Plant, pipeline and receiving and filtering at Port of Açu – RJ.


VALE – Conceição Itabiritos Project – Itabira – MG

Beneficiation Plant – 12 Mtpy – Conceptual / Basic / Detailed Engineering.Project under development with Project Automation Technology (3D). Hiring of services via LTA-Vale contract.


VALE – Carajás – additional 40 MTPA

The Additional 40 mtpy plant aims at increasing the iron ore production (hematite with 62-65% Fe) of VALE Northern System at 40mtpy, expanding the capacity of the current production in 40%, increasing from 100 to 140 mtpy with the implementation of BSMV, Secondary and Tertiary Crushing, Surge Yard, Screening, Storage Yard, Shipping and Loading. The dry operation of ROM ore will be processed. The project is currently with 99.9% of physical progress and the implementation at the site with 75% completed.


SAMARCO – Fourth Pelletizing Plant – Mariana – MG

Beneficiation and Pelletizing Plants – 10,5Mtpy of Concentrate / 8.25Mtpy of Pellet – Basic and detailed engineering. Technical support for construction.