VALE – Carajás – additional 40 MTPA

The Additional 40 mtpy plant aims at increasing the iron ore production (hematite with 62-65% Fe) of VALE Northern System at 40mtpy, expanding the capacity of the current production in 40%, increasing from 100 to 140 mtpy with the implementation of BSMV, Secondary and Tertiary Crushing, Surge Yard, Screening, Storage Yard, Shipping and Loading. The dry operation of ROM ore will be processed. The project is currently with 99.9% of physical progress and the implementation at the site with 75% completed.


SAMARCO – Fourth Pelletizing Plant – Mariana – MG

Beneficiation and Pelletizing Plants – 10,5Mtpy of Concentrate / 8.25Mtpy of Pellet – Basic and detailed engineering. Technical support for construction.


SAMARCO – Fourth Pellet Plant Project – Ubu – Es

Pelletizing plant – 8.25 Mtpa of Pelotas.
Conceptual design, basic and detailed.
Technical support works.


MUSA – Detailed Engineering – ITM Oeste – Itatiaiuçu – MG

Beneficiation Plant – 3.4 Mtpy – Detailed Engineering.Project of the utmost importance in Usiminas vertical operations.


SAMARCO – Third Pelletizing Plant Project – Mariana – MG / Ubu – ES

Beneficiation Plant and Pelletizing Plant – 7 Mtpy of concentrate / pellet – Conceptual, basic, detailed engineering and technical support to construction.Ramp-up project curve is now the benchmark of BHP Billiton and Vale.


VALE – Brucutu Project – São Gonçalo do Rio Abaixo – MG

Beneficiation Plant – 24 Mtpy of products – Conceptual, basic and detailed engineering; technical support to construction; preparation of the commissioning plan / preparation of specific documentation, support for development / automation system integration and support to commissioning and testingThe largest Iron Ore Beneficiation Plant in the world in initial capacity.